Sunday, June 9, 2019

Engine installation wrap-up & more...

Another solid day. Ended looking like this!

Harmonic balancer pulley was incorrect. Correct one (taller) on the left.






Restored (original) valve covers going on...

Distributor is in.

Fuel line & fittings installed to fuel pump

Fuel line elbow

Fan and fan clutch installed.


Bypass hose in place (temp radiator hose as well)

Choke tube in place

Spark plug wires hooked to Dizzy




Installed fuel line from fuel pump to filter and fuel filter to F.I.  

Freshly painted coil clamp will go on the following day.


Belts are installed.


Lower spark plug wire guides installed.


More exhaust fitment wrestling. Driver side is done!



End of day, Saturday.

No comments:

Post a Comment